Free video tools

Free Timecode Calculator

Add or subtract timecodes, find clip duration, and convert frames or seconds. Choose your frame rate and keep the numbers in step with your edit.

Free. No signup. No file needed.

What would you like to calculate?

Match the frame rate and timecode counting used in your project.

Use hours:minutes:seconds:frames, such as 00:00:12:10. The last pair is frames, not decimal seconds.

Results update as you type. Calculate saves the current result to recent history.

You don't need to upload a video. Enter the timecodes from your editor. Calculations run in your browser. Copy or download a result when you want to keep it.

Example result

00:00:20:00

Total frames
480
Elapsed time
20 s
Calculation settings

24 fps NDF

Frame counts are exact within the supported limits. Elapsed seconds are rounded for display.

How to use the timecode calculator

1

Choose your task

Add or subtract durations, measure a clip between In and Out points, convert units, or total a list of clips.

2

Match your project

Choose the frame rate and DF or NDF counting. Enter your timecodes, frame count, or elapsed seconds.

3

Check and keep the result

See the timecode, total frames, and elapsed time together. Copy the result or download it with the settings attached.

Fewer scribbled sums. More actual editing.

What do the numbers in a timecode mean?

A timecode identifies a frame using hours, minutes, seconds, and frames: HH:MM:SS:FF. At 25 fps, 00:00:12:10 is 12 seconds and 10 frames from the origin. That's 310 frames, or 12.4 seconds.

The final pair counts frames, not hundredths of a second. Those last two digits are doing more work than they look.

Adobe explains timecode and frame identifiers.

Timecode calculation examples

Load an example to see the inputs, result, and settings together.

TaskFrame rateCalculationResultLoad example
Add durations25 fps NDF00:00:12:10 + 00:00:07:2000:00:20:05 · 505 frames
Subtract durations25 fps NDF00:00:20:00 − 00:00:07:1200:00:12:13 · 313 frames
Convert frames25 fps NDF1,000 frames00:00:40:00 · 40 seconds
Measure a clip24 fps NDF, exclusive Out01:00:00:00 to 01:00:10:0000:00:10:00 · 240 frames

Add up clip durations without the spreadsheet

Paste a list of durations or In/Out pairs and check every row before using the total. Keep one frame rate and counting mode for the list.

Add clip names so the export still makes sense tomorrow. Copy the total or download a CSV with each clip's duration, frame count, and settings. Your spreadsheet can sit this one out.

Drop-frame vs non-drop-frame timecode

Drop-frame timecode skips certain labels to keep the numbering close to elapsed clock time. It doesn't remove pictures from your video.

At 29.97 DF, 00:00:59;29 is followed by 00:01:00;02. Labels ;00 and ;01 are skipped at the start of each minute except every tenth minute.

Non-drop-frame keeps the labels in sequence. At fractional frame rates, its timecode clock and elapsed time drift apart. Always match your project's counting mode.

Apple explains how drop-frame labels work.

Why the frame rate changes the answer

One thousand frames last 40 seconds at 25 fps, but about 41.667 seconds at 24 fps. The frame count is the same; the playback duration isn't.

For fractional rates, this calculator uses 24000/1001, 30000/1001, or 60000/1001 internally. It shows timecode and elapsed seconds separately, so one isn't mistaken for the other.

Changing a rate setting reinterprets the input. To convert an existing value, choose whether to keep elapsed time or frame count in the conversion settings.

How the calculations work

The calculator converts valid timecodes to whole frame counts before adding, subtracting, or measuring a range. It then formats the answer using your selected rate and counting mode.

Clip duration uses Out minus In when Out is the first excluded frame. If Out is the last included frame, the calculation adds one frame.

For a handoff, copy the calculation with its frame rate and counting mode. A bare timecode can leave the next editor guessing.

Duration addition = frames(A) + frames(B)

Exclusive-Out duration = frames(Out) − frames(In)

Inclusive-Out duration = frames(Out) − frames(In) + 1

Elapsed seconds = total frames ÷ exact frame rate

Adobe documents inclusive In/Out marks.

FFmpeg's timecode helpers provide an implementation reference.

Plan export size from elapsed duration with the Video File Size Calculator.

Trusted by creators worldwide

Reloop completely changed how we run SaaS ads. Our average engagement increased by 62% in the first 30 days, and we finally know which creative angles deserve more budget.
Lucas Gonzales
Lucas Gonzales
CEO, Vizion
Our content created with Reloop generated more than 58,000 organic views in one month. We’re publishing consistently and staying visible without living inside an editor.
Alexandre Derocq
Alexandre Derocq
Founder, Casanea
Editing one video used to take nearly two hours. With Reloop, our average production time is down to 14 minutes, including captions and final edits. No final-final-v6 required.
Clément Carrere
Clément Carrere
Director, Easy Virtual Tour
We created four course promotions with Reloop, and they directly contributed to 27 additional course sales during our latest launch.
Freddy Janssens
Freddy Janssens
Founder, Formation.Academy
Reloop helped us research competitors and test 18 different creative angles in seven days. We now learn what works before committing serious campaign budget.
Juliette Charpentier
Juliette Charpentier
Head of Acquisition, Nooz Optique
We’ve saved approximately €3,200 in external production costs over three months while publishing more content than before. We no longer need a studio for every campaign.
Olivier Mounié
Olivier Mounié
Head of Ojetables

Create your next marketing video

Turn your next idea into an ad, social video, product demo, or explainer with Reloop.

See pricing
FAQ

Timecode calculator FAQs

The small details that make a frame-sized difference.

Choose Add or subtract, match your project's frame rate and counting mode, and enter both durations. The calculator works in whole frames before formatting the answer. Read the rate and mode beside the result before copying it.

Your Out mark may identify the last included picture instead of the first excluded picture. Choose the matching option. Premiere documents inclusive In/Out marks, so identical In and Out values select one frame. Because one frame can start a surprisingly long conversation. Reference

No. It skips timecode labels, not video frames. Choose DF only when that is how your project counts timecode. Reference

This calculator uses non-drop-frame counting at 23.976 fps. DF is available at 29.97 and 59.94 fps. A fractional frame rate doesn't automatically mean drop-frame timecode. Reference

Enable the timecode-wrap option only when Out follows In across the end of a 24-hour label cycle. Otherwise, an earlier Out point is flagged so you can correct it.

Batch totals use one frame rate and counting mode. Convert values deliberately before combining them; mixing labels from different rates can produce a misleading total.

No. Enter the values from your editor. Calculations run in your browser, and you can copy or download the results.

More tools

Keep your next move simple.

A few more free tools to help you research, create and publish.